Reduce AFE overruns
AFE vs actual + NPT lookback
Reduce repeat AFE overruns with phase-level cost and NPT lookbacks.
Challenges we solve
- Cost and time for the same well live in separate systems
- Lost time is buried inside generic cost codes
- Lookbacks finish too late to change the next AFE
Questions you can ask
- Which wells are >10% over AFE and which cost categories drive it?
- Which NPT codes drove overrun dollars on this pad?
- Where is invisible lost time hiding in “drilling” codes?
ERPERP / APWellViewERP / WellView
Example view